ETC Shoping Center, FIER

Construction works of the ETC Shopping Center in the city of FIER with a construction area of ​​7,800 m2 and 11,200 m2 parking.

– The works of electrical installations, weak currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-The works of the electrical installations of the ETC Shopping Center after completion are tested and mortgaged.

11-storey multifunctional building, Ferizaj, Kosovo

Construction works of a residential building and service premises in the city of FERIZAJ, KOSOVO, 10 residential floors + 1 service floor, divided into 132 apartments and 35 service shops.

-Boiler system installation works, after completion are tested and mortgaged.

Tahiraj +IE, Fier

Construction works of the warehouse + offices near the Social Center “MURIALDO” FIER of the firm “TAHIRAJ + IE” LLC

-Workings of electrical installations, weak currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Works of Electrical, Hydraulic installations, MKZ + Springera, Chiller system Heating / Cooling, after completion are tested and mortgaged.

Golemi Construction Orikum-Vlora

Construction works of 3 Buildings (Apartments) in ORIKUM – VLORA. Subject “GOLEMI CONSTRUCTION” VLORA (ORIKUM).

– The works of electrical installations, weak currents, lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

– Works of Electrical, Hydraulic, MKZ, installations, after completion are tested and mortgaged.

ETC Shoping Center, Stip, Macedonia

Construction works of the ETC Shopping Center in the city of STIP, MACEDONIA. Construction area 5,400 m2 and parging 6,200 m2.

-Workings of electrical installations, weak currents, lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-The works of the electrical installations of the ETC Shopping Center, after completion are tested and mortgaged.

Pikaso Hotel, Vlora

Construction works of the PIKASO hotel in Radhime, VLORE. 4-storey building with 45 rooms + restaurant + outdoor facilities (green pools, etc.)

-Workings of electrical installations, weak currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

– The works of Electrical, Hydraulic installations, Solar panel system and Central Boiler for sanitary water, MKZ, after completion are tested and mortgaged.

Elkos Agrar, Lushnja

Construction works of fruit / vegetable collection point for the company ELKOS LLC, construction of refrigeration rooms + offices in the city of LUSHNJE / GRABIAN. With construction area, refrigerated rooms 5,800m2, offices 1,400m2, parking 12,000m2.

– The works of electrical installations, weak currents are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Works of Electrical and Hydraulic installations, MKZ for ELKOS LLC, after completion are tested and mortgaged.

-Construction of electric cabin power 1000 kw, Connection 04 / 35kw.

ETC Shoping Center, Gostivar, Macedonia

Construction works for the ETC Shopping Center in GOSTIVAR, MACEDONIA. Construction area 6,500 m2 and parking 8,200 m2.

– The works of electrical installations, weak electric currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-The works of the electrical installations of the ETC Shopping Center after completion are tested and mortgaged

Beton EG, Fier

Construction works of the silo + offices and outdoor facilities in the city of FIER of the subject “BETON EG” with a construction area of ​​1,500m2 + 1,000m2 of outdoor facilities.

-Working of electrical installations, weak currents and lightning is carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Works of Electrical, Hydraulic and MKZ installations after completion are tested and mortgaged.

Fraeno Agriculture, Fier

Construction works of the fruit / vegetable collection point of the investor ART VRUSHO City of Fier, KAFARAJ area for the company JORDIL SH.A. Construction of refrigeration rooms + offices. Construction area refrigerated rooms 1,200m2, offices 100m2, parking 2,500m2.

– The works of electrical installations, weak currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Works of Electrical and Hydraulic installations, MKZ for JORDIL JSC, after completion are tested and mortgaged.

Elkos, refrigeration rooms, Peja, Kosovo

Works for the company ELKOS LLC construction of refrigeration rooms in the city of PEJA / ZAHAC (KOSOVO). With construction area, refrigerated room 4,200m2, parking 1,500m2.

-Working of electrical installations, weak currents and lightning is carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

Elkos warehouse, Peja, Kosovo

Construction works of the central warehouse for the company ELKOS LLC Construction of the warehouse in the city of PEJA / ZAHAC, KOSOVO. With construction area 3,800m2, parking 1,200m2.

– The works of electrical installations, weak currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Electrical installation works for ELKOS LLC after completion are tested and mortgaged.

Ruby Palace Hotel, Vlora

Construction works of the hotel Ruby Palace Hotel, VLORA. 5-storey building with 22 rooms + restaurant + outdoor facilities.

– The works of electrical installations, weak currents and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

– Electrical installation works, Solar panel system and Central boiler for sanitary water and chiller system Heating / Cooling ceiling, after completion are tested and mortgaged.

Marina Bay, Vlora

Construction works in the resort MARINA BAY / VLORE. Subject VALONA CONSTRUCTION, service, restaurant, bars, reception, conference office with construction area 1,700m2 and outdoor areas – greenery, swimming pools parking 3,200 m2.

-Electrical installation works have been carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-After the completion of electrical installations, weak currents and lightning are tested and mortgaged.

Spar Supermarket, Vlora

Construction works of the SPAR market of the subject VALONA KONSTRUKSION in the city of VLORA, with a construction area of ​​1,500m2 + offices.

-Electrical installation works have been carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-After the completion of electrical installations, weak aspirations and air conditioning, are tested and mortgaged.

ETC Shoping Center, Kaçanik, Kosovo

Construction works of the ETC Shopping Center in the city of KACANIK / KOSOVO, with a construction area of ​​3,900m2, construction and parking 4,000 m2.
-Working of electrical installations, weak currents and lightning is carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-The works of the electrical installations of the ETC Shopping Center, after completion are tested and mortgaged.

Elkos Factories, Peja, Kosovo

Works for carrying out the construction of the factory bag production line, the factory for the kirik packaging line, the factory for the packaging line wet paper for the company ELKOS LLC in the city of PEJA / ZAHAC, KOSOVO. With construction area 3,300m2, 4300M2, 4700M2 parking 1,000m2, 2800M2 and 2400M2

-Working of electrical installations, weak currents and lightning is carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Electrical installation works for ELKOS LLC, after completion are tested and mortgaged

Visi Vaqo Subject, Fier

Construction works of the shed + office and outdoor facilities in the city of FIER, of the subject “VISI VAQO”. 5-storey building, 3 service floors, 2 residential floors, total area 2000m2 + outdoor facilities 500m2.

-Works of electrical installations, weak currents, lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

-Works of Electrical installations, Hydraulics, MKZ, chiller heating / cooling system.

Seven Havens Residence, Vlora

Construction works of the hotel SEVEN HAVENS RESIDECE in JONUFËR, VLORA. 5-storey building with 35 rooms + restaurant + bars, sauna, outdoor facilities (swimming pool, greenery, etc.)
– The works of electrical installations of weak currents, lightning are being carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

– Works of Electrical, Hydraulic installations, Solar panel system and Central Boiler for sanitary water, MKZ, ongoing.

Hotel, Dhërmi

Construction works of the hotel owned by TAN NITO, DHËRMI, VLORA / SUB-CONTRACTOR.

3-storey building with 35 rooms + restaurant + bars, outdoor facilities (green pools, etc.)

– The works of lightning receiving installations, Hydraulic, are performed according to the criteria of the European Union.

Warehouse, Lushnja

Construction works of the warehouse + office and outdoor facilities in the city of Lushnja, Kolonje, of the subject “BARDHI LLOZANA” with construction area 1,800m2 + 1,000m2 office + fason, parking 1,900m2

-Workings of electrical installations, weak lines and lightning are carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

Chimarea Hotel, Himara

The works for the construction of Chimaera Hotel of the subject FLORIDA F.H SH.P.K. HIMARE. 5-storey building with 58 rooms + basement, restaurant + bars, swimming pool, outdoor areas.

-The works of electrical installations and weak current are being carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

– Electrical, hydraulic installation works, weak lines, lightning arresters, Solar panel system and Central Boiler for sanitary water, MKZ, In progress.

Marriott Hotel, Arena Center, Tirana

Construction works in the building ARENA

– The works of Electrical, Hydraulic and MCZ installations are being carried out within the standards and conditions of implementation according to the criteria of the European Union,ongoing.

ETC Shoping Center, Tirana

Works for the construction of the ETC Shoping Center in the city of Tirana

– The works of electrical installations, weak currents, lightning strikes, MKZ and springs are being carried out within the standards and technical conditions of implementation according to the criteria of the European Union.

– Electrical installation works of the ETC Shopping Center will be approved and mortgaged upon completion.

Tulipan Complex, Tiranë

Works for the construction of the Tulip Complex, in the city of Tirana

-The works of hydraulic installations, MKZ and VRF are being carried out within the standards and technical conditions of implementation according to the criteria of the European Union.